Skip to content
Cognascents
Your Long-Term Engineering Solutions Provider
CognascentsCognascents
  • Home
  • How We Deliver
  • Services
    • Asset Integrity Services
      • Integrity Program Assessment, Execution, and Optimization
      • Risk-Based Inspection (RBI)
      • Corrosion Control Document (CCD) & Integrity Operating Windows (IOWs)
      • Mechanical Integrity (MI) Program Assessment
      • Fitness-For-Service (FFS)
      • Asset 3D Visualization
      • Training Solutions
    • Process Engineering Services
      • Pressure Relief System Design and Evaluation
      • Alarm Rationalization
      • Flare System Design
      • Process Engineering Design Services
      • Operating Procedure Generation
      • Process Simulation & Modeling Services
    • Process Safety Services
      • Process Hazard Analysis (PHA)
      • PSM/RMP Compliance Audits
      • Safe Operating Limits (SOL) Development
      • PSM Program Development and Support
      • Risk Management Program (RMP) Development and Support
      • Process Safety Information (PSI) Solutions
      • Open Recommendations Resolution
      • Training Solutions
      • Facility Siting Studies
    • Reliability Services
      • Reliability and Maintenance Program Assessment, Execution, and Optimization
      • CMMS/EAM Asset Data Solutions
      • Criticality and Maintenance Strategies
      • Spare Parts Management
      • Monitoring & Continuous Improvement
  • Markets
  • Who We Are
    • Our Mission
    • Career
      • Sr. Process Safety Engineer – PHA Facilitator
      • Risk-Based Inspection Engineer
      • Integrity Engineer
      • Sr. Process Engineer – Relief Systems
      • Process Engineer
      • Process Engineer – Relief Systems
      • Process Safety Engineer
    • Contact Us
  • Resources
    • Case Studies
    • News
    • Technical Blog
    • Whitepapers
Linkedin page opens in new window

blog

  • Home
  • How We Deliver
  • Services
    • Asset Integrity Services
      • Integrity Program Assessment, Execution, and Optimization
      • Risk-Based Inspection (RBI)
      • Corrosion Control Document (CCD) & Integrity Operating Windows (IOWs)
      • Mechanical Integrity (MI) Program Assessment
      • Fitness-For-Service (FFS)
      • Asset 3D Visualization
      • Training Solutions
    • Process Engineering Services
      • Pressure Relief System Design and Evaluation
      • Alarm Rationalization
      • Flare System Design
      • Process Engineering Design Services
      • Operating Procedure Generation
      • Process Simulation & Modeling Services
    • Process Safety Services
      • Process Hazard Analysis (PHA)
      • PSM/RMP Compliance Audits
      • Safe Operating Limits (SOL) Development
      • PSM Program Development and Support
      • Risk Management Program (RMP) Development and Support
      • Process Safety Information (PSI) Solutions
      • Open Recommendations Resolution
      • Training Solutions
      • Facility Siting Studies
    • Reliability Services
      • Reliability and Maintenance Program Assessment, Execution, and Optimization
      • CMMS/EAM Asset Data Solutions
      • Criticality and Maintenance Strategies
      • Spare Parts Management
      • Monitoring & Continuous Improvement
  • Markets
  • Who We Are
    • Our Mission
    • Career
      • Sr. Process Safety Engineer – PHA Facilitator
      • Risk-Based Inspection Engineer
      • Integrity Engineer
      • Sr. Process Engineer – Relief Systems
      • Process Engineer
      • Process Engineer – Relief Systems
      • Process Safety Engineer
    • Contact Us
  • Resources
    • Case Studies
    • News
    • Technical Blog
    • Whitepapers

Monthly Archives: October 2018

You are here:
  1. Home
  2. 2018
  3. October

Leave Room for Yourself or Else You Will Lose Yourself

Technical BlogBy CognascentsOctober 30, 2018

“Life moves pretty fast.  If you don’t stop and look around once in a while, you could miss it.” – Ferris Bueller The personal significance of the above quote from one of my favorite movies has evolved since my high school days.  In high school, Ferris’ wisdom was a good reminder to get my head…

Effects of Inlet Pressure Loss on Pressure Relief Valve Stability

Technical BlogBy CognascentsOctober 16, 2018

One of the challenges in relief valve sizing is ensuring the stability of the relief valve.

 Dream-Theme — truly premium WordPress themes

281.717.8590hello@cognascents.com
Offices | Houston, Texas | Calgary, Alberta |

Go to Top