Services›Process Safety Services›Facility Siting Studies

Facility Siting Studies

An occupied building can be affected by hazards well beyond its walls. Whether you are planning a new building or reassessing an existing one after process changes, Cognascents Consulting Group performs facility siting studies that evaluate credible fire, explosion, and toxic release scenarios — so you can make informed decisions about location, occupancy, and protection.

When Clients Engage Us

Common reasons organizations engage facility siting services

Organizations typically engage Cognascents for facility siting studies when they are facing:

▸A new occupied building being sited near process equipment
▸A PHA or MOC that triggers an API RP 752/753 siting review requirement
▸Portable buildings or trailers being brought onsite without a formal siting evaluation
▸Concerns about blast, thermal, or toxic exposure risk to existing structures
▸Facility expansion or process changes that shift the hazard footprint
▸Preparing for a PSM audit that will examine facility siting documentation
Our Approach

A siting study grounded in what could actually happen, not just where a building happens to sit.

A facility siting study evaluates blast overpressure, thermal radiation, and toxic gas dispersion impacts on occupied buildings in accordance with API RP 752, 753, and 756. It satisfies the facility siting element required in every process hazard analysis under OSHA 29 CFR 1910.119(e)(3)(v) — and under EPA RMP 40 CFR 68.67(c)(5) for Program 3 processes — giving you a data-driven basis for siting decisions, building upgrades, and operational safeguards. Cognascents applies a consequence-based or risk-based approach, as API RP 752 permits, matched to your site and corporate risk criteria, to deliver studies that hold up to scrutiny.

Step 01

Front-End Data Collection

Front-End Data Collection

We analyze PHAs, site drawings, occupancy data, and incident history to identify the hazard scenarios your siting study needs to evaluate.

Step 02

On-Site Evaluation & Consequence Modeling

On-Site Evaluation & Consequence Modeling

We conduct facility walkdowns to verify data and building use, then simulate fire, explosion, and toxic release scenarios using blast impact analysis — including vapor cloud explosion (VCE) modeling — thermal radiation modeling, gas dispersion simulation, and BLEVE modeling as applicable.

Step 03

Impact Analysis & Recommendations

Impact Analysis & Recommendations

We evaluate hazard impacts on buildings and occupants based on location and construction, then deliver prioritized, practical mitigation strategies, from siting changes to building upgrades to operational safeguards.

Why Cognascents

Why choose Cognascents for facility siting studies

Process Safety Experience Applied to Your Site

PRACTITIONER-LED EXPERTISE
Process Safety Experience Applied to Your Site

Our process safety team works from your process hazards, building use, and site conditions. We connect the siting evaluation to the PHAs and operating information that establish which scenarios deserve attention.

Modeling Tied to Credible Scenarios

DATA-DRIVEN CONSEQUENCE MODELING
Modeling Tied to Credible Scenarios

We use appropriate blast, thermal, and dispersion analyses to show how identified events could affect occupied buildings. Site walkdowns and data review help keep the assumptions grounded in actual conditions.

A Clear Basis for Mitigation Decisions

PRACTICAL, PRIORITIZED RECOMMENDATIONS
A Clear Basis for Mitigation Decisions

We translate the results into practical options, such as changes to occupancy, building protection, or operating safeguards, and help your team prioritize where to act first.

“A building sited before anyone asked what’s stored 200 feet away isn’t sited. It’s placed.”
Engineer and site manager review a building plan inside a blast-resistant module
Standards & Codes We Work To

The API standards and regulatory frameworks that govern facility siting.

OSHA 29 CFR 1910.119 (PSM) — facility siting is a required PHA element under 1910.119(e)(3)(v)API RP 752 (Management of Hazards Associated with Location of Process Plant Permanent Buildings)API RP 753 (Management of Hazards Associated with Location of Process Plant Portable Buildings)API RP 756 (Management of Hazards Associated with Location of Process Plant Tents)EPA RMP 40 CFR 68.67(c)(5) — facility siting in Program 3 process hazard analysesCCPS Guidelines for Evaluating Process Plant Buildings for External Explosions, Fires, and Toxic Releases
WHAT’S ACTUALLY NEAR YOUR OCCUPIED BUILDINGS?

Let’s talk about whether your current siting basis reflects your actual hazard footprint.

Our engineers will give you a direct read on where your facility siting documentation has gaps.

Talk to an Engineer

Keep reading for what a well-run siting study delivers and the services that connect to it. ↓↓

What You Gain

A clear, standards-compliant basis for protecting people and buildings.

Facility siting decisions deserve more than a rule-of-thumb distance. An occupied building risk assessment from Cognascents gives you a quantified, defensible basis for protecting the people closest to your process.

QUANTIFIED HAZARD IMPACT

Real numbers on overpressure, thermal, and toxic exposure

Consequence modeling gives you an actual quantified basis for siting decisions instead of a rule-of-thumb distance.

REGULATORY COMPLIANCE

A study that satisfies API RP 752/753/756 and OSHA expectations

Our documentation is built to meet the standards regulators and auditors expect to see referenced.

INFORMED SITING & MITIGATION DECISIONS

Prioritized recommendations from siting changes to building upgrades

We give you a clear path forward, not just a list of risks with no direction on what to do about them.

REDUCED RISK TO PERSONNEL

Occupied buildings evaluated against real hazard scenarios

Understanding actual consequence potential lets you protect the people most exposed to a credible event.

Related Services

Supporting services that strengthen your siting basis

Cognascents connects facility siting to the hazard analysis and programs it depends on.

THE HAZARD SCENARIOS YOUR SITING STUDY EVALUATES

Process Hazard Analysis (PHA)

Facility siting studies draw heavily on PHA findings to identify credible hazard scenarios. We keep the two connected.

Explore PHA Services →

THE PROGRAM YOUR SITING STUDY SUPPORTS

PSM Program Development and Support

Facility siting is one piece of a broader PSM program. We help make sure it’s integrated with the rest.

Explore PSM Program Support →

THE RELIEF AND FLARE LOADS THAT DRIVE CONSEQUENCE SCENARIOS

Flare System Design

Relief and flare system behavior often factors directly into facility siting consequence modeling.

Explore Flare System Design →

Related Content

Facility siting articles and case studies

Case studies and technical articles from the engineers who lead these engagements.

ARTICLE | PROCESS SAFETY

Rethinking EAC and HAC: Why Ventilation Design Matters

How electrical area classification and ventilation design intersect with facility layout decisions in ways that are easy to overlook.

Read: EAC, HAC, and Ventilation Design →

ARTICLE | PROCESS SAFETY

PHAs and Flare Systems

What happens when a PHA team reaches the flare and relief system portion of a HAZOP, directly relevant to siting consequence scenarios.

Read: PHAs and Flare Systems →

ARTICLE | AI & ENGINEERING

AI-Accelerated Engineering Services: What does that really mean?

How Cognascents applies AI across process safety disciplines to accelerate data-intensive engineering work.

Read: AI-Accelerated Engineering →

FACILITY SITING QUESTIONS, ANSWERED DIRECTLY

Frequently asked questions about API 752 and 753 facility siting

What is a facility siting study?

A facility siting study evaluates how fire, explosion, and toxic release scenarios could affect occupied buildings — permanent buildings, portable buildings, and tents — using consequence-based or risk-based analysis of blast overpressure, thermal radiation, and toxic gas dispersion. It is the formal mechanism most operators use to address the facility siting element of a process hazard analysis.

When is a facility siting study required?

Facility siting must be addressed in every PHA for a PSM-covered process under OSHA 29 CFR 1910.119(e)(3)(v), and for Program 3 RMP processes under 40 CFR 68.67(c)(5). In practice, a study is triggered by new or relocated occupied buildings, portable buildings brought onsite, management of change that shifts the hazard footprint, and PHA revalidation cycles.

What is the difference between API RP 752, 753, and 756?

All three govern occupied buildings, divided by building type: API RP 752 covers permanent buildings, API RP 753 covers portable buildings such as trailers, and API RP 756 covers tents. The distinction matters because portable buildings and tents carry different occupancy restrictions and placement criteria than permanent structures.

How often should a facility siting study be revalidated?

Most operators revalidate facility siting on the same five-year cycle as the PHA it supports, per 29 CFR 1910.119(e)(6) — and sooner when a change adds occupied buildings, alters inventories, or shifts the hazard footprint. A siting study that no longer reflects the site is a documented gap waiting for an auditor.

Consequence-based or risk-based — which approach is right?

API RP 752 permits either. A consequence-based study compares modeled overpressure, thermal, and toxic impacts against damage criteria; a risk-based study adds event frequency to evaluate individual and aggregate risk. Consequence-based is often sufficient for screening; risk-based earns its cost where buildings cannot practically be moved and mitigation decisions carry real capital.

Brass compass on engineering drawings with process unit piping beyond

Talk to an engineer about your facility siting study

Tell us about your occupied buildings and what’s sited nearby. One of our engineers will give you a straight answer about what an API 752/753-aligned siting study would find.