Skip to content
Cognascents
Your Long-Term Engineering Solutions Provider
CognascentsCognascents
  • Home
  • Services
    • Asset Integrity Services
      • Asset 3D Visualization
      • Corrosion Control Document (CCD) & Integrity Operating Windows (IOWs)
      • Fitness-For-Service (FFS)
      • Integrity Program Assessment, Execution, and Optimization
      • Mechanical Integrity (MI) Program Assessment
      • Training Solutions
      • Risk-Based Inspection (RBI)
    • Process Engineering Services
      • Process Engineering Design Services
      • Pressure Relief System Design and Evaluation
      • Flare System Design
      • Operating Procedure Generation
      • Alarm Rationalization
      • Process Simulation & Modeling Services
    • Process Safety Services
      • Process Hazard Analysis (PHA)
      • Process Safety Information (PSI) Solutions
      • Safe Operating Limits (SOL) Development
      • Open Recommendations Resolution
      • PSM Program Development and Support
      • Risk Management Program (RMP) Development and Support
      • PSM/RMP Compliance Audits
      • Training Solutions
    • Reliability Services
      • Reliability and Maintenance Program Assessment, Execution, and Optimization
      • CMMS/EAM Asset Data Solutions
      • Criticality and Maintenance Strategies
      • Reliability and Maintenance Digitalization
      • Spare Parts Management
      • Monitoring & Continuous Improvement
      • Vibration Troubleshooting and Condition Monitoring
  • Markets
  • Who We Are
    • Our Mission
    • Our Team
    • Career
      • Sr. Process Engineer – Relief Systems
      • Process Engineer – Relief Systems
      • Sr. Process Safety Engineer
      • Process Engineer
      • 3D Designer
      • Integrity Engineer
    • Contact Us
  • Resources
    • Case Studies
    • News
    • Technical Blog
    • Whitepapers
Linkedin page opens in new window

blog

  • Home
  • Services
    • Asset Integrity Services
      • Asset 3D Visualization
      • Corrosion Control Document (CCD) & Integrity Operating Windows (IOWs)
      • Fitness-For-Service (FFS)
      • Integrity Program Assessment, Execution, and Optimization
      • Mechanical Integrity (MI) Program Assessment
      • Training Solutions
      • Risk-Based Inspection (RBI)
    • Process Engineering Services
      • Process Engineering Design Services
      • Pressure Relief System Design and Evaluation
      • Flare System Design
      • Operating Procedure Generation
      • Alarm Rationalization
      • Process Simulation & Modeling Services
    • Process Safety Services
      • Process Hazard Analysis (PHA)
      • Process Safety Information (PSI) Solutions
      • Safe Operating Limits (SOL) Development
      • Open Recommendations Resolution
      • PSM Program Development and Support
      • Risk Management Program (RMP) Development and Support
      • PSM/RMP Compliance Audits
      • Training Solutions
    • Reliability Services
      • Reliability and Maintenance Program Assessment, Execution, and Optimization
      • CMMS/EAM Asset Data Solutions
      • Criticality and Maintenance Strategies
      • Reliability and Maintenance Digitalization
      • Spare Parts Management
      • Monitoring & Continuous Improvement
      • Vibration Troubleshooting and Condition Monitoring
  • Markets
  • Who We Are
    • Our Mission
    • Our Team
    • Career
      • Sr. Process Engineer – Relief Systems
      • Process Engineer – Relief Systems
      • Sr. Process Safety Engineer
      • Process Engineer
      • 3D Designer
      • Integrity Engineer
    • Contact Us
  • Resources
    • Case Studies
    • News
    • Technical Blog
    • Whitepapers

April 23, 2025

You are here:
  1. Home
  2. 2025
  3. April
  4. 23

Calibration of PCMS RBI Methodology for Offshore Platforms

Case StudiesBy Norberto PinedaApril 23, 2025

Case StudyCalibration of PCMS RBI Methodology for Offshore Platforms Client: Offshore Oil & Gas Operator | Location: Gulf of America A major offshore oil and gas operator was reliant on a qualitative risk-based inspection (RBI) methodology, which depended on subjective judgment and manual risk ranking. This approach led to inconsistencies in risk evaluations across similar…

 Dream-Theme — truly premium WordPress themes

281.717.8590[email protected]
Offices | Houston, Texas | Calgary, Alberta |

Go to Top