Skip to content
Cognascents
Your Long-Term Engineering Solutions Provider
CognascentsCognascents
  • Home
  • How We Deliver
  • Services
    • Asset Integrity Services
      • Integrity Program Assessment, Execution, and Optimization
      • Risk-Based Inspection (RBI)
      • Corrosion Control Document (CCD) & Integrity Operating Windows (IOWs)
      • Mechanical Integrity (MI) Program Assessment
      • Fitness-For-Service (FFS)
      • Asset 3D Visualization
      • Training Solutions
    • Process Engineering Services
      • Pressure Relief System Design and Evaluation
      • Alarm Rationalization
      • Flare System Design
      • Process Engineering Design Services
      • Operating Procedure Generation
      • Process Simulation & Modeling Services
    • Process Safety Services
      • Process Hazard Analysis (PHA)
      • PSM/RMP Compliance Audits
      • Safe Operating Limits (SOL) Development
      • PSM Program Development and Support
      • Risk Management Program (RMP) Development and Support
      • Process Safety Information (PSI) Solutions
      • Open Recommendations Resolution
      • Training Solutions
      • Facility Siting Studies
    • Reliability Services
      • Reliability and Maintenance Program Assessment, Execution, and Optimization
      • CMMS/EAM Asset Data Solutions
      • Criticality and Maintenance Strategies
      • Spare Parts Management
      • Monitoring & Continuous Improvement
  • Markets
  • Who We Are
    • Our Mission
    • Career
      • Sr. Process Safety Engineer – PHA Facilitator
    • Contact Us
  • Resources
    • Case Studies
    • News
    • Technical Blog
    • Whitepapers
Linkedin page opens in new window

blog

  • Home
  • How We Deliver
  • Services
    • Asset Integrity Services
      • Integrity Program Assessment, Execution, and Optimization
      • Risk-Based Inspection (RBI)
      • Corrosion Control Document (CCD) & Integrity Operating Windows (IOWs)
      • Mechanical Integrity (MI) Program Assessment
      • Fitness-For-Service (FFS)
      • Asset 3D Visualization
      • Training Solutions
    • Process Engineering Services
      • Pressure Relief System Design and Evaluation
      • Alarm Rationalization
      • Flare System Design
      • Process Engineering Design Services
      • Operating Procedure Generation
      • Process Simulation & Modeling Services
    • Process Safety Services
      • Process Hazard Analysis (PHA)
      • PSM/RMP Compliance Audits
      • Safe Operating Limits (SOL) Development
      • PSM Program Development and Support
      • Risk Management Program (RMP) Development and Support
      • Process Safety Information (PSI) Solutions
      • Open Recommendations Resolution
      • Training Solutions
      • Facility Siting Studies
    • Reliability Services
      • Reliability and Maintenance Program Assessment, Execution, and Optimization
      • CMMS/EAM Asset Data Solutions
      • Criticality and Maintenance Strategies
      • Spare Parts Management
      • Monitoring & Continuous Improvement
  • Markets
  • Who We Are
    • Our Mission
    • Career
      • Sr. Process Safety Engineer – PHA Facilitator
    • Contact Us
  • Resources
    • Case Studies
    • News
    • Technical Blog
    • Whitepapers

Daily Archives: November 17, 2025

You are here:
  1. Home
  2. 2025
  3. November
  4. 17

Putting the Rational in Alarm Rationalization

Technical BlogBy Norberto PinedaNovember 17, 2025

Technical BlogPutting the Rational in Alarm Rationalization Alarm Rationalization is the process of reviewing the process control system alarms in a unit, deciding which are necessary and how to prioritize them.  While this is a simple exercise, it can be very time-consuming.  Most clients have a clear understanding of their objectives – alarms should be…

 Dream-Theme — truly premium WordPress themes

281.717.8590hello@cognascents.com
Offices | Houston, Texas | Calgary, Alberta |

Go to Top