Enhancing Refinery Safety with a Strategic Safe Operating Limits (SOL) Framework

Case StudyEnhancing Refinery Safety with a Strategic Safe Operating Limits (SOL) Framework Client: Refinery The client sought to establish an SOL framework for their refinery. The goal was to establish specific operating boundaries to enhance safety, optimize operational procedures, and ensure regulatory compliance. This pilot study needed to identify SOLs that could later be scaled…

Future-Ready Mechanical Integrity Program: Harnessing Contextualization and 3D Visualization

Case StudyFuture-Ready Mechanical Integrity Program: Harnessing Contextualization and 3D Visualization Client: Fertilizer Plant Our client was facing challenges with their time-based Mechanical Integrity program, which leveraged inspection methods that were failing to target critical damage mechanisms and susceptible areas. Additionally, their existing Integrity Data Management Systems (IDMS) was hindered by outdated, incomplete data and poor…

Pressure Relief Analysis (PRA) Independent Review

Case StudyPressure Relief Analysis (PRA) Independent Review Client: Downstream Operator | Location: USA Our client was initiating a brownfield project to meet more stringent environmental requirements. They sought an independent review of the relief system design basis for new relief devices being installed for the project. Our Solution Performed an independent analysis of a representative…

Reliability Program Improvement & Execution

Case StudyReliability Program Improvement & Execution Client: NGL Operator | Location: Texas, USA Our client had previously engaged a different engineering consultancy to implement a Computerized Maintenance Management System (CMMS), conduct a Reliability Centered Maintenance (RCM) study, and deliver a targeted maintenance regime. Despite these efforts, the client continued to experience equipment failures and poor…